Plan-Do-Check-Act (PDCA) is a four-step cycle for continuous improvement. It is the foundation of most modern management systems, including quality, environmental and occupational health and safety systems. The cycle is often linked to W. Edwards Deming and Walter Shewhart and is sometimes called the Deming cycle or PDSA (Plan-Do-Study-Act).
In safety, PDCA helps organizations move from reacting to incidents to systematically finding and reducing risk.
The Four Steps
Plan
Identify hazards and risks, set objectives and decide what actions are needed. This includes hazard identification, risk assessments, legal requirements and safety goals.
Do
Implement the plan. Put controls in place, train workers, communicate procedures and allocate resources.
Check
Monitor and measure results. Use inspections, audits, leading indicators, lagging indicators, incident investigations and management reviews to see whether the plan is working.
Act
Take action to improve. Correct gaps, update procedures, standardize what works and feed lessons into the next planning cycle.
PDCA in Safety Management Systems
ISO 45001 is built around PDCA. Its clauses map to the cycle:
- Plan: context, leadership, worker participation and planning (clauses 4 to 6).
- Do: support and operation (clauses 7 and 8).
- Check: performance evaluation (clause 9).
- Act: improvement (clause 10).
ANSI/ASSP Z10, OSHA's Recommended Practices for Safety and Health Programs, and most safety management systems follow the same logic.
PDCA Example
A site has several hand injuries from box cutters.
- Plan: analyze incidents, choose safety knives with auto-retracting blades and set a goal of zero cutter injuries.
- Do: replace knives, train workers and update the job hazard analysis.
- Check: track hand injuries and observe use for three months.
- Act: roll the change out to other sites and add it to purchasing standards.
Common Mistakes to Avoid
- Planning and doing without ever checking results.
- Treating PDCA as a one-time project instead of a continuous loop.
- Checking only lagging indicators.
- Not standardizing successful changes.
How SMS360 Helps
SMS360 supports every stage of PDCA. Risk Assessment supports planning, Training Management and Document Library support doing, Audit Management and Analytics & Reports support checking, and Actions Management drives improvements to completion.
Frequently Asked Questions
Who created the PDCA cycle?
The cycle is based on work by Walter Shewhart and was popularized by W. Edwards Deming, who later favored the term Plan-Do-Study-Act.
How does ISO 45001 use PDCA?
ISO 45001 organizes its requirements around the PDCA cycle so organizations continually improve their OH&S performance.
What is the difference between PDCA and PDSA?
PDSA replaces "Check" with "Study," emphasizing learning from results. The steps are otherwise similar.

